Heavy-haul convoy of lowboy trailers loaded with yellow construction equipment moving across an open highway at golden hour
LAT 41.8827° N
LON 87.6233° W
CONVOY ACTIVE
ROUTE: I-90 WB
ESCORT: 2 PILOT CARS
PERMIT: IL-2026-0847
Operational Record
11,400+
oversized loads delivered — port to job site

The final miles
standard freight
won't touch.

Excavators from Savannah port. Turbines from Chicago rail. Industrial presses down two-lane county roads. Every permit pulled, every bridge clearance confirmed to the inch — before your load rolls.

States Permitted
38
Active Permits
214
Max Payload
300T
On-Time Rate
97.3%
Lowboy TrailersSuperload PermitsBridge AnalysisPilot Car CoordinationRail Depot PickupPort Yard ReleaseRoute Pre-SurveyJust-In-Time DeliveryUtility Line LiftsCounty Road ClearanceLowboy TrailersSuperload PermitsBridge AnalysisPilot Car CoordinationRail Depot PickupPort Yard ReleaseRoute Pre-SurveyJust-In-Time DeliveryUtility Line LiftsCounty Road Clearance
Load Categories

Every load category.
One operator.

Earthmoving, energy infrastructure, industrial equipment — we move them all with the same permit precision and route intelligence.

01 — EARTHMOVING

Excavators & Dozers

CAT 390, Komatsu PC800, Liebherr R 9200. Port-yard pickup to active construction site. Zero ramp-up time on permit staging.

  • Up to 120 tons operating weight
  • Lowboy & RGN trailer configs
  • Crane-assist offload coordination
02 — ENERGY

Transformers & Turbines

90-ton transformers down two-lane county roads — we pull the permits, pre-run the route, and confirm every bridge clearance before the load moves.

  • Transformer hauls to 350 tons
  • Wind turbine nacelles & towers
  • Modular platform trailer configs
03 — INDUSTRIAL

Presses & Reactors

Industrial press installations, chemical reactor vessels, refinery modules. We coordinate the installation window so your crew isn't standing idle.

  • Hydraulic gooseneck trailers
  • Multi-axle spreader beams
  • Just-in-time site delivery
LIVE METRICS
LIVE
47
active
Loads In Transit
12
processing
Permits Pending
23
corridors
States Active
3.2
days
Avg Lead Time
04 — WEIGHT RANGE
40–80TStandard Heavy
80–150THeavy Haul
150–300TSuperload
Operational Proof

The numbers that matter
when the load is rolling.

METRIC: ON-TIME DELIVERY WINDOW
97.3%
On-Time Window Accuracy

Route simulation runs 72 hours ahead of every move.

Our dispatch team pre-stages permits, runs bridge analysis, and simulates the route against live traffic and weather data — so your installation window doesn't slip because of a county road weight restriction nobody checked.

SYSTEM STATUS — 01
Q1Q2Q3Q4
METRIC: ACTIVE PERMIT CORRIDORS
214
Corridor Permits Active Across 38 States

Regulatory intelligence built into every route, not bolted on after.

State permits, municipal overlays, holiday blackout calendars, bridge weight certificates, utility line lifts — we maintain active corridors so your load doesn't sit in a staging yard while someone figures out the paperwork.

SYSTEM STATUS — 02
Q1Q2Q3Q4
METRIC: FLEET PREDICTIVE MAINTENANCE
48H
Predictive Breakdown Alert Window

Telematics-driven fleet health monitoring across every unit.

Predictive maintenance systems flag potential mechanical issues 48 hours before they become dispatch problems. Our 97% fleet uptime rate means the tractor pulling your 200-ton load doesn't go down on I-70 at 2 AM.

SYSTEM STATUS — 03
Q1Q2Q3Q4
600M
Tons/yr oversize US freight
38
States with active corridors
80K
Federal base weight limit (lbs)
300K+
Max permitted GCW (lbs)
19%
Delivery window reduction via AI routing
30%
Telematics adoption growth 2023–25
Field Verified

Procurement managers.
Plant engineers. Project directors.

The people whose schedules depend on the load arriving on time — they chose Haul.

The crane was three days late from the port. Haul had it on site in 14 hours once it cleared — permits already pulled, route pre-run. My installation crew didn't lose a single shift.

Marcus Delgado, Procurement Manager at Turner Construction
Marcus Delgado
Procurement ManagerTurner Construction

We had a 90-ton transformer that needed to go down CR-12 — a county road with two questionable bridges. Haul came back with the full bridge cert package before we even finished the RFQ.

Priya Nambiar, Plant Engineer at Eaton Power Systems
Priya Nambiar
Plant EngineerEaton Power Systems

Eight turbine nacelles, four different states, two holiday weekends. They tracked every permit blackout and rerouted two loads proactively. Zero delays on a $40M installation schedule.

Brett Kowalski, Project Director at NextEra Energy
Brett Kowalski
Project DirectorNextEra Energy

The crane was three days late from the port. Haul had it on site in 14 hours once it cleared — permits already pulled, route pre-run. My installation crew didn't lose a single shift.

Marcus Delgado, Procurement Manager at Turner Construction
Marcus Delgado
Procurement ManagerTurner Construction

We had a 90-ton transformer that needed to go down CR-12 — a county road with two questionable bridges. Haul came back with the full bridge cert package before we even finished the RFQ.

Priya Nambiar, Plant Engineer at Eaton Power Systems
Priya Nambiar
Plant EngineerEaton Power Systems

Eight turbine nacelles, four different states, two holiday weekends. They tracked every permit blackout and rerouted two loads proactively. Zero delays on a $40M installation schedule.

Brett Kowalski, Project Director at NextEra Energy
Brett Kowalski
Project DirectorNextEra Energy

I've worked with five heavy-haul carriers. Haul is the only one that calls me before I call them. Proactive permit updates, live load tracking, actual accountability.

Sandra Okafor, VP Logistics at Granite Construction
Sandra Okafor
VP LogisticsGranite Construction

A 200-ton hydraulic press, rail depot to a greenfield plant in rural Ohio. They pre-staged at a rail siding, ran a partial route survey, and delivered inside a 4-hour installation window.

James Whitfield, Senior Project Manager at Kiewit Industrial
James Whitfield
Senior Project ManagerKiewit Industrial

The routing intelligence alone is worth the premium. They flagged a utility line conflict on our planned route that would've cost us a week. Fixed it before the truck left the yard.

Diane Chen, Equipment Coordinator at Fluor Corporation
Diane Chen
Equipment CoordinatorFluor Corporation

I've worked with five heavy-haul carriers. Haul is the only one that calls me before I call them. Proactive permit updates, live load tracking, actual accountability.

Sandra Okafor, VP Logistics at Granite Construction
Sandra Okafor
VP LogisticsGranite Construction

A 200-ton hydraulic press, rail depot to a greenfield plant in rural Ohio. They pre-staged at a rail siding, ran a partial route survey, and delivered inside a 4-hour installation window.

James Whitfield, Senior Project Manager at Kiewit Industrial
James Whitfield
Senior Project ManagerKiewit Industrial

The routing intelligence alone is worth the premium. They flagged a utility line conflict on our planned route that would've cost us a week. Fixed it before the truck left the yard.

Diane Chen, Equipment Coordinator at Fluor Corporation
Diane Chen
Equipment CoordinatorFluor Corporation
Active Corridor Intelligence

214 permits active.
38 states covered.

Pre-pulled corridor permits mean your load can move when the window opens — not after a 3-day permit processing delay.

CORRIDOR PERMIT STATUS BY STATELIVE
Active corridorPending setup
SELECTED CORRIDOR
Texas
TXACTIVE
Active Permits38
Loads In Transit12
Status● CORRIDOR ACTIVE
TOTAL NETWORK
214
Total Permits
47
Active Loads
Free Resource

The Heavy-Haul
Planning Guide.

The same permit intelligence and route-planning framework our dispatch team uses — formatted for procurement managers who need to brief their project directors.

GUIDE CONTENTS — 47 PAGES
  • 01State-by-state permit timeline reference (38 states)
  • 02Bridge classification checklist for loads over 80T
  • 03Escort vehicle requirements by load width/weight
  • 04Holiday blackout calendar — all 50 states
  • 05Route pre-survey protocol for rural county roads
  • 06Installation window coordination framework
PDF · 47 pages · Updated Feb 2026
ACCESS THE GUIDE

No sales calls. One email with your download link. Unsubscribe anytime.